Monday, March 28, 2011

Cleaning and organising

 I was able to get to the garage for a few hours on sunday to clean up and pick up.  I cleaned out about 10bags of trash, pushed back a few cabinets, hung the rest of the ceiling speakers and got them working.  its getting there...

Wednesday, March 16, 2011

Moved in

Well everything is moved into the garage.  Its a good feeling, but its a BIG MESS!

I still need to mount the speakers in the ceiling and finishing painting 1/2 the ceiling.   But at least its all in there.  Now where to put it all?!

Tuesday, March 15, 2011

More Painting

I've gotten most of the painting done.  All the walls, and 1/2 the ceiling, the rest of the ceiling will have to wait until i unload the storage into the garage and set up the garage.  I need to return the storage container. 

It will be nice to see the Locost out of storage and back to sitting idle (haha) in the garage, also having my tools where i can get to them will be NICE!  man i miss having them at my fingertips.

Thursday, March 10, 2011

Painting

I took the day off work so that i could make some good progress in the garage.  I got the last of the OSB up in the garage, and then i started to paint.  I got 2 coats of primer up, on all the walls and the ceiling and that took me up until 9:30pm.  13.5hr day...

  I also had a friend stop over to pull the trailer out of the yard to infront of the garage so when i was ready I can unload it.  Well a brand new Dodge 1500 could not figure itself out to put any real power down to pull the 18' trailer out of the yard?  I never really hunkered down and dug... It thought about it but it seamed like the traction control would kick in and not let it dig...  I guess its time to get the real HD trucks over there and pull it out.

Tuesday, March 8, 2011

Wall Board

  Ben and I worked last night and got the back wall up and 2 sheets up on the ceiling.  Its coming together, slowly but it will get there.  Having the insulation in there makes a HUGE difference.  Its up to temp and hot in there in no time.  We even turned off the heater for over a hour.  Here are a few crappy Cell phone pics.  I will take better ones before i start tonight.

Backwall


You can see all the outlets :)
Front wall

Monday, March 7, 2011

Wiring, Insulation & Sheeting

  I got the rough wiring inspection done and it didn't pass, i had the grounds and the neutrals backwards in the box so i had to swap them, he also wanted the main power feed encased in PVC in the walls, so i had to also do that.  I also needed "Tamper resistant" outlets...  So i had to swap out 18 outlets.  I got all of those changes made by last Wednesday and i was waiting for the inspector to OK it so that i could insulate and put up the sheeting.  I didn't get a response Thursday and i called until i got a hold of him on Friday and he gave me the ok to insulate and put up the wall sheeting.

  My father came and helped me insulate Saturday and we got it all up on Saturday.  Sunday i was only able to work for about 3.5hrs, but Ben and I got both of the sidewall sheeting up.  Ill be out there again tonight trying to get the back wall done along with starting the ceiling.  Its defently getting there.